QUALITY DEPARTMENT 5S
July 22 through July 26, 2002
Team members: LaRhonda Darden, John Oxton, Pat Burke, Paula Foote, Hector Hernandez, Norma Garay, and Linda Rowland
This event took a total of 264 hours to complete.
SORT
- Cleaned out unneeded items stored in the QA Lab.
- Cleaned out all needed items in QA Lab (for relocation).
- Cleared out unneeded items and unused gages from the Eagle acquisition in QA Dimensional Inspection Area.
- Removed the pegboard full of visual samples.
- Removed unneeded files and documents in QA Filing System.
SET IN ORDER
- Organized retained items in QA Lab and QA Dimensional Inspection Area.
- Segregated and labeled the majority of gages used for inspection.
- Moved an additional worktable to the QA Lab to aid in streamlining the first part inspection process.
- Moved optical comparator, two (2) gage storage cabinets, and layout binder cabinet.
- Labeled items and areas in the QA Lab.
- Organized filing cabinets in a logical manner.
- Labeled files and file drawers.
- Segregated SPC paperwork to area where inspection is completed.
SHINE
- Painted the QA Lab walls, shelving and inspection table.
- Painted the QA Die Casting Workstation.
- Repaired and painted the carts used for Final Inspection Areas.
STANDARDIZE
- Standardized the documents and equipment needed for first part inspections.
- Standardized the SPC documents needed in their specific areas.
- Arranged and labeled gages.
- Standardized QA files.
SUSTAIN
- Revised QA Weekly Check Sheet to include inspections of items covered in the QA 5S event.
REMAINING ACTION ITEMS-LaRhonda-work with maintenance to determine best method to get vinyl baseboard properly secured. Linda-order an additional drop gage so SPC inspections can be completed in the QA Dimensional Inspection Area. Paula-complete filing cabinet tabs.
Pictures taken of team members performing the 5S
 clean and paint |
 painting |
 repair cart |
 one room painted |
 clean cabinets |
 clean lights |
 planning |
 review red tags |
 red tag area |
Click here for before and after pictures of the 5s event.
[back to 5S examples]