Main Sections
• Main
• TOC
• Lean Mfg.
• Quotes
|
PAN TUBE MEETING
Date: August 14, 2003
ATTENDING: Scott, David, John, Joe, Perry, Jerry
1.IDENTIFY:
Cracked parts at customer
2.EXPLOIT:
POSSIBLE CAUSES:
- Solder on broken part?
- Rough handling?
- Process parameters?
- Part design?
- Radii at base of tube instead of chamfer?
- Alloy?
- Insufficient draft?
- Parts cracked at machining?
POSSIBLE CURES (ACTION ITEMS):
CAUSE #1 - ACTION ITEMS
*Increase gate to reduce gate velocity. (done on 7-10-2003)
*Reduce shot speed if possible. (JB)
CAUSE #2 - ACTION ITEMS
*Customer to investigate their shipping methods (Customer)
CAUSE #3 - ACTION ITEMS
*Investigate all parameters of the process. (special emphasis on dwell time and shot speed) (JB)
CAUSE #4 AND #5 - ACTION ITEMS
*Request chamfer in lieu of radii. (TP)
CAUSE #6 - ACTION ITEMS
*Send two parts to material vendor to verify alloy. (DP)
CAUSE #7 - ACTION ITEMS
*Measure draft on center core. (DP)
CAUSE #8 - ACTION ITEMS
*Look for cracks at machining on next run. (PC)
[top]
[back to 5 step examples]
|
|